Good times and redundant fiber lie ahead…


Proposed Route Proposed Route
Note the orange markings showing existing fiber. It's going to be a little close for the directional boring guys…
Proposed dual entrance route - Building Penetration Proposed dual entrance route – Building Penetration
They're going to get in there with a bobcat and dig down, then drill a hole in the side of the building to shove the fiber through.


3 thoughts on “I got to work to see this in the parking lot”

  1. picture this in your head

    I can imagine paul standing out there while they dig with a cattle-prod in hand shouting "If you touch my existing cable, I will shock you." lol

    1. Re: picture this in your head

      The existing cable does not belong to us. Our existing cable enters on the other side of the building (this is the final leg of a diverse fiber entrance). The other fiber belongs to a competitor of ours. (and theirs is diverse too)

    2. Re: picture this in your head

      I did do something similar to this when they were resurfacing part of the parking lot right over our existing single entrance fiber, though.